This week saw a massive jump in the construction, the 3 assembly personnel arrived on Monday, work started straight away on emptying the load from the truck, this contained all the timbers we require later and also all the wall elements, day one saw all the wall elements in place, day 2 consisted of doing the roof trusses and pillars for the terrace, day 3 entailed the bracing of the roof trusses and gable end top elements, days 4 and 5 fitting of the vapour seal and roof battens, along with doing the valleys on the porch and terrace, all in all a very good week, the construction crew did about 130 hours on the actual build, they did an exception job on it too. nothing to be picked up on or corrected. Now all that remains to be done is about 57% of the construction, unfortunately that will be mostly down to me, woe woe woe.
Next stage is, putting the weather board on the roof trusses and then covering it with panel, on the inside, start to do the drainage system, integrated vacuum cleaner, water pipes, insulation and steel reinforcing for the concrete floor, hopefully that will take care of the next few weeks.
Bracing and fitting of roof trusses, back terrace.

No comments:
Post a Comment